📍 What is Jeddah Central Project?
The Jeddah Central Project is one of the largest urban development projects in Jeddah, Saudi Arabia, aiming to transform central Jeddah into a world-class Red Sea waterfront destination combining residential, commercial, cultural, recreational, sports, and hospitality elements.
It is part of Saudi Vision 2030 to diversify the economy, boost tourism, and improve quality of life.
🧱 Developer
📌 Jeddah Central Development Company (JCDC)
The main developer of the project.
Fully owned by the Public Investment Fund (PIF) of Saudi Arabia.
📊 Vision & Objectives
The project aims to create an integrated coastal city that provides:
A complete environment for living, working, and leisure
Tourist and resident attractions
Economic support through investment and tourism
Elevating Jeddah as a global coastal destination
📐 Location & Size
🌍 Location: Heart of Jeddah, along the Red Sea coast.
📌 Total area: ~5.7 million sqm
📌 Waterfront promenade: ~9.5 km along the Red Sea
📌 Sandy beaches: ~2.1 km of coastline
🏙️ Key Components
🏖 Waterfront & Marina
Luxury marina for yachts and leisure boats
9.5 km coastal promenade with restaurants, cafés, shops, and public spaces
Red Sea beachfronts for residents and tourists
🎭 Cultural & Landmark Attractions
World-class Opera House
Museum & Cultural Center
Event Theater & Stadium
Oceanarium & Coral Farms
These aim to promote cultural, educational, and tourism activities.
🏡 Residential & Hospitality
~17,000 modern housing units — from apartments to luxury residences
2,700+ hotel rooms with branded and resort properties
Integrated communities with amenities and leisure facilities
🛍️ Retail & Entertainment
Large retail and entertainment areas with shops, restaurants, and family attractions
Public plazas and events along the waterfront
🏟️ Sports Facilities
Large stadium for sporting events and global competitions
Public sports facilities and recreation areas
🗺️ Phases & Timeline
The project is implemented in three main phases:
📌 Phase 1 (until 2027)
Basic infrastructure
Waterfront, marina, and beaches
Key landmarks like Opera House and Stadium
📅 Covers ~45% of the total project area
📌 Phase 2 (until 2030)
Museum, innovation district, and cultural/educational zones
📅 Covers ~36% of the project area
📌 Phase 3 (post-2030)
Remaining development including lifestyle and green enhancements
📅 Covers ~19% of the total area
💰 Economic Impact
Estimated contribution of SAR 47+ billion to the economy by 2030
Creation of 25,000+ job opportunities across multiple sectors


